Request a Quote →

Mold Tilting and Maintenance Equipment

EAS mold rotating, tilting and maintenance equipment

Mold Tilting and Maintenance Equipment Products(4)

Mold Rotating and Maintenance Equipment

In most plants mold maintenance is done on blocks laid out on the floor with the help of a crane. That is neither safe nor quick: opening and closing the mold, turning it over and inspecting it all take a long time. EAS maintenance solutions make these operations fixed, safe and repeatable.

In the field this equipment group is referred to by the names mold tilting, mold rotating and mold upending together; all three describe tipping the mold through 90° under control.

EIT mold inspection table

Solutions

ProductFunction
EIT Mold Inspection TableMold maintenance and inspection table — 1500 / 2000 / 3000 / 6000 kg capacity options
Mold Inspection UnitHydraulic mold opening and rotating; light curtain safety equipment
EMR Mold Rotating UnitElectric tilting / rotating — needs no hydraulic unit, 90° rotation
Die SplitterSeparates and turns the mold halves — 2 – 60 tons

Hydraulic or electric?

Hydraulic units provide high force and are preferred on heavy molds; they do, however, require a hydraulic power unit, hoses and periodic oil maintenance.

The EMR electric rotating unit needs no hydraulics: installation is simple, there is no risk of oil leakage and the maintenance burden is low. If the mold weight is in the right range, the electric solution is more practical.

Safety

In mold opening and rotating operations the crushing risk is the greatest danger. The light curtain on the inspection units stops the movement when the operator enters the hazardous area. Compared with the manual block-and-crane method, that is the clearest difference.

Related: Transport and Storage Solutions · quick mold clamping systems

The real reason maintenance gets postponed

Mold maintenance is usually postponed not through lack of knowledge but because it is difficult and risky. Lifting the mold with a crane, opening it on blocks, turning it over and putting it back takes time and is dangerous. These solutions turn maintenance into a job that can actually be done.

The product family

ProductFunction
EITMold inspection table, 1,500 – 6,000 kg
Inspection UnitMold inspection unit with light curtain
EMRElectric mold rotating unit, no hydraulics
Die SplitterDie splitter, 2 – 60 tons

The difference between hydraulic and electric rotating

Hydraulic rotators can release the load uncontrolled in the event of a pressure loss and require leakage maintenance. The EMR electric rotator has no hydraulics; the movement takes place at a controlled speed by electric drive and holds its position when stopped.

Crushing risk

The most serious type of accident in mold maintenance is a hand or foot caught between the two mold halves. An inspection unit with a light curtain stops the movement when the protected area is entered. This is safety provided by hardware rather than by procedure, and it does not depend on human error.

Planning

Maintenance equipment is selected according to the heaviest mold in the plant. For the transport and storage side see the transport and storage solutions page.